This school reduced the need for several other remedial measures in a building where mold was discovered. When the school found that remediation costs with UVC would be considerably lower, they were able to use the funds instead to expand and upgrade the building.
DownloadStepping Stones Center, Cincinnati, OH
Nov 30, 2022
Application Brief